Product Details:
|
Applicable Industries: | Environmeatal Protection | Type: | Sludge Dewatering Press |
---|---|---|---|
After-sales Service Provided: | Video Technical Support, Field Installation, Commissioning And Training, Field Maintenance And Repair Service, Free Spare Parts, Online Support | Warranty: | 2 Years |
Power: | 45KW | Material: | Stainless Steel/Carbon Steel |
Application: | Sludge Dewatering | Raw Material: | Civil Sludge, Industrial Sludge |
Port: | Shanghai | ||
High Light: | twin screw press,electric screw press |
Electric Screw Press Wastewater Treatment Dehydrator Field Installation
Extrusion and dehydration of sludge is carried out via strong force resulting from the change of spiral spindle diameter and screw pitch, as well as tiny gap between float ring and fixing ring. Sludge is concentrated by gravity at concentration system before transfered to dehydration system. During delivery, filtration gap and screw pitch get smaller, and internal pressure is produced with resistance of back pressure plate and volume is reduced, thus realizing extrusion and dehydration.
Model | spindle diameter (mm) | Emission height of dimension(mm) | dimension( LẞWxH (mm) ) | N.T | Operation Weight |
SYD-130 | ф130 | 45 | 1500x1150x1550 | 550 | 740 |
SYD-200 | ф200 | 65 | 2000x1450x1800 | 1150 | 1500 |
SYD-301 | ф300 | 80 | 2550x1100x2150 | 950 | 1350 |
SYD-302 | ф300 | 160 | 2550x1300x2150 | 1700 | 2500 |
SYD-303 | ф300 | 250 | 2550x1800x2150 | 2500 | 3800 |
Model | Capacity of pure dry sludge (concentration) | Capacity of sludge handling | ||||
Low (kg/h) | High (kg/h) | dimension | 5000mg/L | 10000mg/L | 20000mg/L | |
SYD-130 | 30 | 45 | 14m3/h | 6m3/h | 5m3/h | 2m3/h |
SYD-200 | 40 | 65 | 20m3/h | 8m3/h | 7m3/h | 3m3/h |
SYD-301 | 50 | 80 | 25m3/h | 10m3/h | 8m3/h | 4m3/h |
SYD-302 | 100 | 160 | 50m3/h | 20m3/h | 16m3/h | 8m3/h |
SYD-303 | 150 | 250 | 75m3/h | 30m3/h | 24m3/h | 12m3/h |
Contact Person: Mrs. Chen
Fax: 86-510-87580223